Workshop Gallery

We moved into our present workshop in May 2019, to give us more space.

Albacore 7500, a 1987 boat built by Don Young, shortly after finishing a complete restoration, which included brand new foredeck and gunwales.
Solo, in for a gelcoat repair.
Wooden Solo in need of a gunwale repair.
Damage more extensive due to water ingress.
Good as new!
The floor of an Albacore that was in a shocking state when it arrived at our workshop.
The same Albacore – finished. What a difference!
A new brass keel band, fitted to a Merlin Rocket.
Ongoing side deck repair to the same Merlin Rocket.
New deck, fitted and varnished on a wooden Albacore.
Re-purposing an old Optimist into a garden seat. Work in progress.
Squib, in for gelcoat and keel repair.
Quite an imposing sight but fits well in our workshop.
Plenty of space for an Albacore and a Squib.
Two Albacores and a K1? No problem!
“Top Dog” in for TLC